01 / Proposed workstream
Measured area reconciliation
Measure habitable buildings, sheds and parking/storage separately; match the survey to title, cadastral records and current authorised uses.
Listing narrative provides an area breakdown with conflicting summary fields.
Before commitment: A single reconciled schedule of legal, built and usable areas.
02 / Proposed workstream
Guestroom conversion
Test en-suite rooms, accessible accommodation, corridor/escape space and housekeeping support against the habitable footprint; compare sixteen keys with lower-capacity options.
16 keys are an existing model assumption, not an approved plan.
Before commitment: Architect feasibility options and written planning/tourism-use advice.
03 / Proposed workstream
Structure and retained fabric
Survey roofs, load paths, floors, timber, damp and protected elements before placing new bathrooms or opening up circulation.
Historic estate described in source material; condition unverified.
Before commitment: Structural/conservation scope coordinated with the proposed use.
04 / Proposed workstream
Water, wastewater and utilities
Verify legal supplies, treatment capacity, drainage, electrical demand, hot water and plant space for a paid hospitality operation.
Proposed technical scope from the retained conversion plan.
Before commitment: Service capacity assessment, permission route and priced infrastructure works.
05 / Proposed workstream
Estate access and maintenance
Review emergency and service access, landscape maintenance and responsibilities across the reported estate; separate optional auxiliary-building reuse from the core hotel.
27.5-hectare claim and auxiliary areas are broker-reported.
Before commitment: Verified boundaries, access rights and annual maintenance/service plan.
06 / Proposed workstream
Opening and procurement
Tender an approved core scope including professional fees, FF&E, pre-opening and programme risks; define the paid team before setting an opening date.
Proposed implementation; existing legacy screen has incomplete capital scope.
Before commitment: Complete cost and programme review alongside the unchanged source model.