01 / Proposed workstream
Stabilisation and weather protection
Survey structural movement, roofs, timber, masonry and water ingress; define safe access and temporary protection before non-essential interior work.
Full restoration is broker-reported; defects require inspection.
Before commitment: Engineer-led stabilisation and repair package with safe access established.
02 / Proposed workstream
Conservation and measured record
Document arches, stonework, joinery and other retained fabric; reconcile built and usable area and identify what alterations may be acceptable.
Fabric visible in matched source photographs; heritage controls unverified.
Before commitment: Measured survey, condition schedule and conservation/planning advice.
03 / Proposed workstream
Hotel layout feasibility
Test sixteen en-suite guestrooms alongside public rooms, fire/access routes and staff support; quantify a lower-key alternative without forcing rooms into unsuitable space.
16 keys are an unapproved source-model assumption.
Before commitment: Feasible options supported by measured usable area and permissions advice.
04 / Proposed workstream
New service strategy
Investigate available utilities and route water, drainage, electrical, ventilation and hot-water systems with minimal damage to retained fabric.
Proposed full-restoration scope; current service capacity unknown.
Before commitment: Coordinated engineering design and priced utility connections.
05 / Proposed workstream
Guest and service experience
Test arrival, lounge/dining, housekeeping, stores and staff facilities within the approved building programme, separating guest privacy from servicing.
Proposed operational brief; room positions unknown.
Before commitment: A complete operating layout and paid service roster.
06 / Proposed workstream
Tender and phased delivery
Tender conservation and fit-out packages with contingency, professional inputs, FF&E and pre-opening scope explicit; sequence work around approvals and structural dependencies.
Proposed implementation; legacy capital scope remains unchanged.
Before commitment: Contractor-backed restoration budget and a permission-led opening programme.