Project dossier 05 / 09 · Hotel pipeline · Riocorvo · Cantabria

Casona de la Pinta

Seller asking price€1.75mTo be negotiated
Casona de la Pinta — Almaro vision, AI renovation conceptCasona de la Pinta — existing estate photograph

Almaro vision is an AI renovation concept, not an existing condition or approved design.

Original photograph · Casona de la Pinta — operator photograph
Guest units modeled
14
Target net nightly rate
€130
Target annual occupancy
50%
Annual NOI target
€40k
Cash yield at ask*
1.11%

*Earlier screening case, after a replacement reserve and before debt and income tax. The full restoration illustrated here has not been costed. Use the works-budget sensitivity below to test larger investment. These are future targets, not current trading; room counts require licence verification.

The opportunity

A small hotel in a stone village.

La Pinta’s reported recent refurbishment provides a condition claim to verify. The present ambition is a complete village-hotel renovation, with a clearer coast and wellness stay and a fourteen-room operating base. Its earlier focused capital allowance does not price that vision; room mix, achieved rates, staffing and a tendered design must establish the investment case.

The Inmo Olaya listing is a high-confidence inferred match to Casona de la Pinta. Confirm the exact building, operating business and sale perimeter. Almaro has no ownership or contractual commitment.

Reported building
1,065 m²
Reported grounds
500 m² plot
Capacity basis
14 hotel rooms
Sale listing reference
Inmo Olaya · 7939148 / 10999

The operator group independently markets fourteen rooms for 28 guests, with extra-bed capacity above that. Use fourteen rooms rather than guest places. Authorised capacity and transferable use still need the licence certificate and approved plans.

View sale listing

Architecture & interiors

A complete new chapter.

Restore the building’s character, renew its services and design the entire guest experience. These studies describe an ambition; a surveyed and priced scheme comes next.

Casona de la Pinta — complete exterior restoration: existing property photographBefore · photograph
Casona de la Pinta — complete exterior restoration: proposed renovation, AI-generated conceptAfter · AI concept
Casona de la Pinta — complete exterior restoration

Restored stone and timber, a renewed retractable awning, limestone terrace paving, hydrangeas and ferns, and tailored garden dining within the existing low stone boundaries. An illustrative design ambition; dimensions, permissions and costs remain to be established.

Before: Casona de la Pinta official operator photography
After: AI design study. Not existing condition or an approved plan. Framing differs.

Cantabrian casona suite: existing property photographBefore · photograph
Cantabrian casona suite: proposed renovation, AI-generated conceptAfter · AI concept
Cantabrian casona suite

A full Cantabrian suite restoration: conserved beams and stone, a new floor and joinery palette, bespoke furnishings and carefully layered light.

Before: Casona de la Pinta — official operator photograph
After: AI design study. Not existing condition or an approved plan. Framing differs.

01 / Proposed workstream

Recent-works audit

Obtain invoices, specifications, completion records and warranties; inspect the roof and services to distinguish completed work from remaining defects.

Refurbishment is source-reported, not independently surveyed.

Before commitment: Verified works history and a prioritised defect schedule.

02 / Proposed workstream

Complete room design

Design each room category around bedding, blackout, lighting, sockets, bathrooms and acoustic privacy. Inspect existing fabric and equipment, then cost a complete specification and any justified reuse.

Room-category distinction from operator material; improvements proposed.

Before commitment: Costed complete guestroom specification and agreed guest standard, reconciled with the earlier capital screen.

03 / Proposed workstream

Arrival and breakfast

Test check-in, luggage, breakfast preparation, stores and guest seating against the compact building, including an out-of-hours arrival procedure.

Operating proposal; no measured shared-space plan available.

Before commitment: Measured arrangement and paid service-hours plan.

04 / Proposed workstream

Fire, access and building services

Review egress, accessibility, electrical and hot-water systems alongside any heritage constraints before specifying alterations.

Proposed technical diligence.

Before commitment: Documented compliance route and essential works package.

05 / Proposed workstream

Wellness and housekeeping

Verify existing wellness provision and safe operating requirements; connect reservation slots, cleaning time, linen and staff cover before promoting packages.

Wellness appears in the retained commercial plan; scope to verify.

Before commitment: Permitted equipment/use, operating procedure and paid booking economics.

The spatial program

How the hotel could work.

Conceptual relationships between guest spaces, rooms and operations. No measured or approved architectural plans have been obtained.

A compact village-hotel programme — conceptual zoning, not a measured plan
Full renovation study; a service roster for fourteen rooms. Conceptual zoning — no measured survey available

Accommodation

The operator group independently markets fourteen rooms for 28 guests, with extra-bed capacity above that. Use fourteen rooms rather than guest places. Authorised capacity and transferable use still need the licence certificate and approved plans.

  • The operator group markets 14 rooms for 28 guests, with extra-bed capacity described separately.
  • The retained material distinguishes doubles, junior suites and a suite.
  • Recent refurbishment is reported; its scope and warranties have not been supplied.

Design brief

  • Keep room categories distinct within a complete guestroom design; inspect the recent works before deciding what sound fabric and equipment can be retained.
  • Plan breakfast, guest assistance and housekeeping as a compact operation with paid relief coverage.
  • Offer private wellness only where the relevant space, equipment, permissions and staffing are verified.

Guest places and extra beds are not additional saleable rooms. The whole-property package is not converted to nightly ADR without a clear duration. No new wellness facility or event capacity is assumed built or authorised.

The property today / 4 photographs

The starting point.

Existing photographs from the operator or sale listing. Open any image for its full view; sources are linked below each photograph.

Acquisition & operating economics

Price the ambition.

Negotiate the acquisition and test the capital required. A more extensive renovation must earn its place in the investment case.

Operating scenario

Casona de la Pinta

€1.75m
40% of askAsking €1.75m

Price sensitivity, not an agreed discount. Only purchase price and its 12% transaction allowance change; operating income stays the same.

€175k + 20% contingency
Original screen · €175k5× works allowance

The full renovation concepts are not costed. This sensitivity increases works and contingency while keeping operating income unchanged; it does not forecast a higher room rate or capture extra closure costs.

Annual cash yield · base target1.11%

€26k cash after replacement reserve ÷ €2.33m screening capital.
Unlevered; before income tax. Not IRR.

Net rate / occupied night
€130
Annual occupancy
50%
Guest units modeled
14
Annual revenue
€359k
NOI before reserve
€40k
Annual paid staff (FTE)
4.5

Capital includes works, 20% works contingency, working capital and a reopening allowance. These are post-improvement assumptions, not current trading. Net rates exclude accommodation taxes and precede commissions; occupancy uses all 365 days.

Where the money goes

Purchase€1,750,000
Transaction allowance · 12%€210,000
Works, design & fit-out allowance€175,000
Works contingency · 20%€35,000
Working capital€90,000
Reopening / ramp allowance€75,000
Screening capital€2,335,000

Allowances need a measured survey and contractor pricing. Financing, tax and any extra central costs are excluded.

A year of operations

Room revenue€332,150
Food, experiences & other sales€26,572
Paid team−€148,500
Property overhead−€40,000
Distribution−€33,215
Room & breakfast inputs−€76,650
Other sales inputs−€9,300
Management & support−€10,762
NOI before reserve€40,295
Replacement reserve · 4% of revenue−€14,349
Annual cash after reserve€25,946
What supports the nightly-rate assumption?

Undated official category prices from €57–89 and two-night double package with breakfast/spa from €225; tax/date details unclear. €2,700 whole-property package lacks duration and cannot establish ADR. €130 net base is unproven repositioning.

Starting prices and individual stay quotes do not establish achieved annual ADR. The target must be tested with monthly room sales, rate mix, seasonality and booking pace.

View the source property

Room-rate evidence

The official rooms page advertises undated starting rates of €57, €63, €69, €79 and €89 by category. Stay dates and tax treatment are unclear. The proposed €130 net annual ADR needs room-mix and demand validation.

Official category prices checked 2026-09-16; no dated stay search.

Property business plan · operating screen

The stay. The team. The demand.

Develop a complete renovation concept for fourteen rooms and the shared spaces, then reprice the earlier lighter-works screen and validate the opening programme and room-rate target.

Commercial priorities

  1. Inspect the recent works and warranties, then design the full guestroom and shared-space renovation; retain sound fabric where compatible with the new specification.
  2. Price doubles, junior suites and the suite separately, testing two-night itineraries against single-night bookings.
  3. Schedule wellness sessions to paid bookings and validate reception, housekeeping and relief within the 4.5-FTE base.

Who would stay here

  • Couples on short Cantabria breaks
  • Independent village-and-coast touring guests
  • Guests booking a room with private wellness time

Proposed sequence

Earlier screening timetable: Illustrative transfer and light refresh: 3–9 months after closing, subject to condition and permissions. Stabilized demand could take 12–24 months after completion. The full renovation design requires its own permission, contractor and closure programme; these durations are not a validated delivery schedule for that design.

Proposed commercial plan; guest segments and interventions are hypotheses to validate. The complete renovation ambition requires a newly priced scope, an opening programme and validation of the room-rate and occupancy targets; the retained operating and capital figures are an earlier screen.

Read the collection operating plan

The diligence room

What we know.
What comes next.

Reprice the complete renovation and validate its room-rate target, paid staffing plan and opening programme before relying on the earlier operating screen.

Advertised property particulars

The operator group independently markets fourteen rooms for 28 guests, with extra-bed capacity above that. Use fourteen rooms rather than guest places. Authorised capacity and transferable use still need the licence certificate and approved plans.

Source available

Operator material

Public operator description and retained source imagery are available; legal identity, licensed capacity and inclusion in the sale still need documents.

Source available

Retained source photographs

4 attributed property photographs are linked. These record advertised appearance; they are not a measured or current-condition survey.

Source available

Investment memo and proposed business plan

Develop a complete renovation concept for fourteen rooms and the shared spaces, then reprice the earlier lighter-works screen and validate the opening programme and room-rate target. The operating plan is illustrative, not actual seller trading.

Source available

Measured floor plans, sections and survey

No measured, architect-certified existing plan or survey is present in the reviewed dossier. The attached SVG is a conceptual relationship diagram only.

To obtain

Approved accommodation and activity plans

No current licence certificate, approved accommodation schedule or complete planning/activity permission set is present in the reviewed material. Key issue: Reprice the complete renovation and validate its room-rate target, paid staffing plan and opening programme before relying on the earlier operating screen.

To obtain

Title, boundaries and sale-assets schedule

Confirm the Inmo Olaya listing, building, business and sale perimeter. The broker reports 1,065 m² built and a 500 m² plot, awaiting documentary reconciliation.

To obtain

Technical reports and contractor quotations

No measured condition report, coordinated services/fire/access design, tendered bill of quantities or construction-ready blueprint is supplied. The workstreams below are a proposed brief.

To obtain

Verified operating accounts and paid roster

No verified actual ADR, occupied nights, NOI or full employee schedule is supplied. Request 36 months of monthly trading, payroll, bookings and capital history where an operating business exists.

To obtain

Property identity

Confirm the Inmo Olaya listing, building, business and sale perimeter.

Decision gate: Reconcile 1,065 m² built and the reported 500 m² plot.

Lawful inventory

14-room certificate, approved layout and guest-place schedule.

Decision gate: Distinguish room count from permitted people and extra beds.

Condition and warranties

Recent refurbishment records and roof/services/access review.

Decision gate: Define and price the full renovation scope from inspected evidence, including justified retention of recent works.

Staffing and demand

Monthly trading, reception coverage, housekeeping times and wellness bookings.

Decision gate: Validate the lean paid roster including relief and out-of-hours coverage.

Transfer and opening

Completed essential works, transferred permissions and trained staff.

Decision gate: Confirm rooms, breakfast and any wellness offer can operate as sold.

The broker reports 1,065 m² built and a 500 m² plot, awaiting documentary reconciliation.

The operator describes the coast as twenty minutes away; no sea view is established.

The whole-property package lacks enough duration detail to convert into a nightly ADR.

Source register & further diligence

Stone window surrounds, a projecting bay and deep eaves give this village casona a clear historic identity. Its compact scale and reported recent refurbishment suggest a different role within the collection: an intimate northern stay rooted in Riocorvo.

  • Confirm identity, title, hotel permissions and the fourteen-room schedule.
  • Review condition, warranties, roof/services and heritage restrictions.
  • Check actual trading and a roster supporting the model’s lean 4.5 paid annual FTE.
  • Price the €175,000 works allowance and contingency; establish a transfer and reopening schedule.
Inmo Olaya · 7939148 / 10999

Existing property record; advertised particulars, not title or a survey.

Casona de la Pinta · operator material

Retained operator material and photographs; not a licence certificate or seller accounts.

Almaro investment memorandum · 16 September 2026

Retained analyst research and screening assumptions.

Almaro property business plan

Proposed interventions, paid operating assumptions and conditional timing; source record in business-plan.json.

Retained photograph source 1

Existing attributed source photography. Marketing imagery does not certify current condition.

Retained photograph source 2

Existing attributed source photography. Marketing imagery does not certify current condition.

Generated visual studies and schematic diagrams are not as-built records or technical approval. A photograph does not verify the sale boundary, condition or licence. Photography publication licences have not been established.